SAL/Agent Registry
Back to Registry
47-2231.00Market Standard — pending BLS/OEWS enrichment

Solar Photovoltaic Installers

Assemble, install, or maintain solar photovoltaic (PV) systems on roofs or other structures in compliance with site assessment and schematics. May include measuring, cutting, assembling, and bolting structural framing and solar modules. May perform minor electrical work such as current checks.

Primary Directive

Install and maintain photovoltaic systems efficiently and safely.

Execution Steps
  1. 1

    Review installation plans and codes

    Examine drawings, schematics, and standards to prepare for installation.

  2. 2

    Identify installation site conditions

    Assess location for orientation, solar access, and structural integrity for PV arrays.

  3. 3

    Assemble and install solar components

    Put together solar modules and support structures according to specifications.

  4. 4

    Test and activate PV systems

    Verify system functionality by testing operating voltages and activating the system.

  5. 5

    Perform routine maintenance and inspections

    Conduct regular checks and maintenance on PV systems to ensure optimal performance.

Toolbox Requirements
Extensible markup language XMLMicrosoft ExcelMicrosoft Office softwareMicrosoft OutlookMicrosoft WordSalesforce software

Free — no credit card required. 200 messages included.